Manhole Rehabilitation

Category:

Description

Brandenburger manhole Liner is setting new standards in Manhole Rehabilitation with the UV-curing GRP shaft manhole liner (BB 2.5 VERTICAL) . The manhole liner, which is delivered to the construction site by the meter, can be completely installed within 2 hours . As it expands, the manhole liner automatically adapts to the geometry of the manhole, eliminating the need for time-consuming prefabrication . The berm is also lined in one step. In order to achieve a tight overall system, the interfaces to the main channel are then designed with hand laminate. Thanks to efficient curing technology and a small footprint on the construction site, the manhole liner (BB2.5 VERTICAL) is the optimal minimally invasive solution for manhole lining

Reviews

There are no reviews yet.

Be the first to review “Manhole Rehabilitation”

Your email address will not be published. Required fields are marked *